I don't think that the footprint is the key factor. Likely the total construction cost is. A large reactor may have a better cost per kWh, averaged over decades of its lifetime, but a smaller reactor likely has a more affordable upfront cost.
How certain are you of your prediction? What odds would you give me if I bet against you?
10:1?
100:1?
Background:
The BWRX predecessor, the ABWR, holds the record for the fastest construction time of a commercial nuclear power plant ever: just slightly over 3 years to first criticality, 4 years total to commercial operation.
Fun fact: it was the success of this first Gen III reactor that caused EDF to predict the EPRs would also only take 3 years to build. Which proved...optimistic. For the EPR. But proven for the ABWR.
This is a 10th Generation Boiling Water Reactor. Here's some relevant links:
https://en.wikipedia.org/wiki/BWRX-300
https://www.gevernova.com/nuclear/carbon-free-power/bwrx-300...
Interesting point: no pumps; convection flow for 100% of the operational envelope.
The BWRX-300 footprint is so large they might as well just build large nuclear power units again and get 3-4x the power
I don't think that the footprint is the key factor. Likely the total construction cost is. A large reactor may have a better cost per kWh, averaged over decades of its lifetime, but a smaller reactor likely has a more affordable upfront cost.
Place your bets now.
Time until first power generated, and actual final total cost.
I’ll go 15 years and $10 Billion.
How certain are you of your prediction? What odds would you give me if I bet against you?
10:1?
100:1?
Background:
The BWRX predecessor, the ABWR, holds the record for the fastest construction time of a commercial nuclear power plant ever: just slightly over 3 years to first criticality, 4 years total to commercial operation.
Fun fact: it was the success of this first Gen III reactor that caused EDF to predict the EPRs would also only take 3 years to build. Which proved...optimistic. For the EPR. But proven for the ABWR.
https://en.wikipedia.org/wiki/Advanced_boiling_water_reactor
https://en.wikipedia.org/wiki/Kashiwazaki-Kariwa_Nuclear_Pow...
https://hannahritchie.substack.com/p/nuclear-construction-ti...
The BWRX is also passively safe: cooling occurs via natural circulation, no pumps needed.
So if it takes 15 years I give you $100, if it takes less you give me $10000?